Ben Buchalter
(954) 613-9854
1205 NE 9th Avenue
Fort Lauderdale Florida 33304

2025 BMW M4 Competition xDrive Coupe

Price:
$97,999.00
  • VIN: WBS33HK05SCS26674
  • Stock: NC-260353522
  • Mileage: 8,173
  • Color: Tanzanite Blue II Metallic
  • Trans: 8-Speed Automatic
  • Engine: 3L I6 24V
  • MPG: 16 City / 23 Highway
  • Drivetrain: AWD
CITY MPG
16
HWY MPG
23
Actual rating will vary with options, driving conditions, habits and vehicle condition.

2025 BMW M4 Competition xDrive








Scroll Down for More Pictures
 
 
  • Make BMW
  • Model M4
  • Year 2025
  • VIN WBS33HK05SCS26674
  • Exterior Tanzanite Blue II Metallic
  • Interior Tartufo
  • Engine 3.0L Twin-Turbocharged I6
  • Transmission Automatic
  • Miles 8173
  • - 2025 BMW M4 Competition xDrive
  • - 3.0L Twin-Turbocharged I6
  • - 8-Speed M Steptronic Automatic
  • - AWD
  • - Tanzanite Blue II Metallic Exterior
  • - Tartufo Extended Merino Leather Interior
  • - Driving Assistance Professional
  • - Parking Assistance Package
  • - Executive Package
  • - 19” Front / 20” Rear Dual-Spoke Bi-Color Wheels
  • - M Shadowline Lights
  • - Carbon Fiber Trim
  • - Front Ventilated Seats
  • - BMW First Aid Kit
  • - M Performance Floor Mats
  • - Luggage Compartment Mat
  • - Wheel Locks
  •  

    We are Exotic Car Trader

    Exotic Car Trader makes car buying safe and secure. Our Team Members are experts at selling classic, luxury, collector, exotic, and even supercars. As a company, we are headquartered out of the state of Florida, but facilitate thousands of sales nationwide.

    Own  This For Only   **$1584 PER MONTH**

    **$1584 per month is based on sale price of $97999 where 6% sales tax is included. 8.99% APR Annual Percentage Rate, 75 month term with $9799.9 due at signing.

    Get Approved at $1584 Instantly
    CLICK HERE


    Video
    Options and Standard Features
    Options
    • 2025 BMW M4 Competition Xdrive
    • 3.0L Twin-Turbocharged I6
    • 8-Speed M Steptronic Automatic
    • AWD
    • Tanzanite Blue II Metallic Exterior
    • Tartufo Extended Merino Leather Interior
    • Driving Assistance Professional
    • Parking Assistance Package
    • Executive Package
    • 19” Front / 20” Rear Dual-Spoke Bi-Color Wheels
    • M Shadowline Lights
    • Carbon Fiber Trim
    • Front Ventilated Seats
    • BMW First Aid Kit
    • M Performance Floor Mats
    • Luggage Compartment Mat
    • Wheel Locks
    Basic Information
    • Stock Number: NC-260353522
    • VIN Number: WBS33HK05SCS26674
    • Style Name: AWD Competition Xdrive 2Dr Coupe
    • Make: BMW
    • Model: M4
    • Model Year: 2025
    • Type: Coupe
    • Vehicle Trim: Competition Xdrive
    • Body Type: Coupe
    • Exterior Color: Tanzanite Blue II Metallic
    • Interior Color: Tartufo
    Engine
    • MPG Automatic City: 16
    • MPG Automatic Highway: 23
    • Engine Description: 3L I6 24V
    • Fuel Type: Gasoline
    • Fuel Induction: DI
    • Valves Per Cylinder: 4
    • Aspiration: Twin-Turbocharged
    DriveTrain
    • 4WD Type: Full Time
    • Transmission: 8-Speed Automatic
    • Wheels Rims: Painted Aluminum Alloy
    • Drive Train Type: AWD
    Suspension
    • Active Suspension
    • Independent Suspension: Four-Wheel
    • Stabilizer Bar: Front And Rear
    Instrumentation
    • Clock
    • Compass
    • External Temp
    • Low Fuel Level
    • Tachometer
    Roof and Glass
    • Front Wipers: Speed Sensitive, Variable Intermittent, Rain Sensing
    • Rear Defogger
    In Car Entertainment
    • Antenna Type: Diversity, Mast
    • Audio System: AM/FM, HD Radio, Voice Operated, Touch Screen Display
    • Premium Brand: Harman/Kardon
    • Speakers: 14
    Seats
    • Drivers: Heated
    • Drivers Height: Power
    • Drivers Lumbar: 4-Way Power Lumbar
    • Drivers Power: 14
    • Passenger: Heated
    • Passenger Height: Power
    • Passenger Lumbar: 4-Way Power Lumbar
    • Passenger Power: 14
    • Seating Capacity: 4
    • Front Seat Type: Sport Bucket
    • Upholstery: Premium Leather
    • Center Armrest
    • Folding: Split
    Convenience
    • Cargo Nets
    • Center Console: Front Console With Armrest And Storage
    • Cruise Control
    • Cupholders: Front
    • Power Outlets: 12V Front, USB Front, USB-C Front
    • Steering Adjustment: Tilt And Telescopic
    • Steering Power: Variable/Speed-Proportional
    • Steering Wheel Control: Audio, Cruise Control, Phone, Multi-Function, Paddle Shifter, Voice Control
    • Universal Remote Transmitter: Homelink - Garage Door Opener
    • Auto Dimming Mirrors
    • Power Mirrors
    • Power Retractable Mirrors
    • Reverse Tilt Mirror
    • Power Door Locks: Auto-Locking
    • Windows: Power Windows
    • Navigation System: Touch Screen Display, Voice Operated
    • Satellite Communication: BMW Assist
    • Memory Features Number Of Drivers: 2 Driver
    Comfort
    • Air Conditioning: Automatic Climate Control
    • Air Filtration: Active Charcoal
    • Trunk Lights
    • Center Console Trim: Leather, Aluminum
    • Dash Trim: Aluminum
    • Door Trim: Leather, Aluminum
    • Reading Lights: Front, Rear
    • Shift Knob: Alloy
    • Steering Wheel Trim: Leather
    • Vanity Mirrors: Dual Illuminating
    Features
    • Bumpers: Body-Color
    Safety
    • ABS: 4-Wheel
    • Anti Theft System: Alarm, Vehicle Immobilizer, Interior Motion Sensor, Anti-Tow Sensor
    • Brake Assist
    • Cornering Lights
    • Daytime Running Light: LED
    • Headlights Auto Delay
    • Front Headrests: Power Adjustable, 2
    • Rear Headrests: 2, Integrated
    • Safety Signal Mirrors
    • Safety Stability Control
    • Trunk Release
    • Driver And Passenger Airbag
    • Side Airbag
    • Stability Control
    Dimensions
    • Front Head Room: 40.3 Inches
    • Front Shoulder Room: 55.1 Inches
    • Front Leg Room: 41.7 Inches
    • Rear Head Room: 35.8 Inches
    • Rear Leg Room: 34.7 Inches
    • Rear Shoulder Room: 51.0 Inches
    • Luggage Capacity: 15.5 Cu.Ft.
    • Maximum Seating: 4
    • Length: 189.1 Inches
    • Width: 81.9 Inches
    • Height: 54.9 Inches
    • Wheelbase: 112.5 Inches
    • Ground Clearance: 4.8 Inches
    • Max Gross Vehicle Weight: 4861 Lbs.
    • Curb Weight: 3979 Lbs.
    Apply Now
    Secure Credit Application
    Applying for a vehicle loan online is one of the quickest and easiest application methods. Our secure application is easy to complete, all you need are a few personal and employment details.
    Contact
    Exotic Car Trader
    1205 NE 9th Avenue
    Fort Lauderdale Florida 33304
    • Hours
    • Mon-Fri:09:00 AM-06:00 PM EST
    • Saturday:09:00 AM-06:00 PM EST
    • Sunday:Closed
    Terms
    We make every effort to present information that is accurate. However, it is based on data provided by the vehicle manufacturer and/or other sources and therefore exact configuration, color, specifications & accessories should be used as a guide only and are not guaranteed. We are not liable for any inaccuracies, claims or losses of any nature. Inventory is subject to prior sale and prices are subject to change without notice and cannot be combined with any other offer(s). The price for listed vehicles as equipped does not include other charges such as: License, Title, Registration Fees, State or Local Taxes, Smog Fees, Credit Investigation, Optional Credit Insurance, Physical Damage of Liability Insurance, Delivery Fees, Finance and/or Documentation Fees. Any and all differences must be addressed prior to the sale of this vehicle. Taxes & Fees:
    Sales tax, tag, title, registration fees, and other government fees are NOT included in the advertised price.
    A $1,299 Pre-Delivery Service Charge is NOT included in the advertised price.